Kamski

Interior Trim Retainer Clip

Seeded demo data

Process FMEA · Injection Molding · Rev C

Part number
KMS-4417-02
Material
PA66-GF15
Process step
Injection Molding
Revision
C
Revised
2026-07-24
Team
Process Engineering, Quality, Tooling
2 controls on the plan no longer match this FMEA.1 of them changes an Action Priority.

Risk analysis

S severity, O occurrence, D detection, each ranked 1 to 10 where higher is worse. Action Priority is a lookup on all three, never S x O x D: High means action is required, Medium that it should be taken, Low that it is optional.

4 causes rated1High1Medium2Low
Item / FunctionFailure ModeCauseSODAction PriorityPrevention ControlDetection Control
FM-01 · Injection Molding
Maintain snap-fit retention force, 45 N minimum pull-out
Out of date
Insufficient retention forceShort shot from low pack pressure857HighPack-pressure setpoint monitored each cycle, alarm on out-of-bandSample pull-force test, 1 per shift
Control plan disagrees

CP-01: Calibrated pull-force tester, lab cell, 3 parts, 1 per week. That supports a Detection of 9. This row carries 7.

Changed 18 Jun 2026 by Quality: sample frequency 1 per shift 1 per week. Pull tester moved to the lab cell, shift sampling no longer staffed. The FMEA was never updated.

Action Priority stays High, so no obligation changes. The rating is still wrong.
FM-02 · Injection Molding
Hold barb geometry to print, 3.20 mm +/- 0.10
Out of date
Retention barb oversized, clip will not seat in panel holeMold cavity wear at the barb detail534LowScheduled tool maintenance at shot count, cavity dimensions logged at each serviceIn-station vision check of barb width, suspect part locked out
Control plan disagrees

CP-03: Manual gauge check at the press, 1 part, 1 per hour. That supports a Detection of 7 to 8. This row carries 4.

Changed 12 May 2026 by Process Engineering: evaluation method In-station vision system, suspect part locked out Manual gauge check at the press. Vision cell removed during the line move, gauge check added as an interim control. The FMEA was never updated.

Action PriorityLowMedium
FM-03 · Injection Molding
Produce a visible face free of moulding defects
Flash at the parting line on the visible faceWorn parting line at the clamp face363LowClamp tonnage verified at setup, parting line inspected at every tool changeAutomated vision check at end of line, reject to chute
FM-04 · Injection Molding
Retain material toughness across the service life of the clip
Clip embrittled, barb cracks in serviceRegrind ratio above 20 percent in the material blend746MediumRegrind ratio capped at 20 percent, signed off on the blend sheet per lotNotched impact test, 1 part per material lot, off-line lab

To watch a row go out of date, change how a detection control is performed on the control plan, then come back.

A Detection rating is a claim about the controls backing it, so a rating the control plan cannot support is flagged as out of date. Ratings and the Action Priority rules follow the AIAG & VDA FMEA Handbook (2019). Editing changes this session only, and a reload restores the seeded documents.