Interior Trim Retainer Clip
Seeded demo dataControl Plan · Injection Molding · Rev C
- Part number
- KMS-4417-02
- Material
- PA66-GF15
- Process step
- Injection Molding
- Revision
- C
- Revised
- 2026-07-24
- Team
- Process Engineering, Quality, Tooling
Controls
Change the method or the frequency on any of the 4 detection controls. Each one states the Detection ratings it can back, and the FMEA row linked to it is checked against that as you go.
| Characteristic | Specification | Evaluation Method | Sample | Control Method | Reaction Plan | Guards Against |
|---|---|---|---|---|---|---|
CP-01 · product Snap-fit retention force Injection Molding Revised 18 Jun 2026 | 45 N minimum pull-out | Calibrated pull-force tester, lab cell | 3 parts Supports D 9 | Logged in the lab record, trend reviewed monthly | Quarantine back to the last passing test, notify process engineering, 100 percent pull test until capability is re-established | FM-01 Insufficient retention force |
CP-02 · process Pack pressure Injection Molding | 620 bar +/- 25 | Press controller readout Prevention control | Every cycle Continuous | Automatic alarm on out-of-band, press holds the cycle | Stop the press, isolate parts back to the last good reading, correct the setpoint before restart | FM-01 Insufficient retention force |
CP-03 · product Retention barb width Injection Molding Revised 12 May 2026 | 3.20 mm +/- 0.10 | Manual gauge check at the press | 1 part Supports D 7 to 8 | Recorded on the setup sheet | Sort back to the last good check, call tooling, verify cavity dimensions at the next service | FM-02 Retention barb oversized, clip will not seat in panel hole |
CP-04 · product Parting line flash on the visible face Injection Molding | No flash above 0.15 mm | End-of-line vision check | 100 percent Supports D 3 to 4 | Automatic reject to chute | Segregate rejects, clean the tool at the next shift change, escalate to tooling above a 2 percent reject rate | FM-03 Flash at the parting line on the visible face |
CP-05 · process Regrind ratio in the blend Material preparation Revised 02 Apr 2026 | 20 percent maximum | Blend recipe verified at the dryer Prevention control | 1 per lot Every material lot | Blend sheet signed by the material handler | Hold the lot, re-blend to specification, impact test before release | FM-04 Clip embrittled, barb cracks in service |
CP-06 · product Notched Izod impact strength Injection Molding | 5.5 kJ/m2 minimum | Notched Izod impact test, off-line lab | 1 part Supports D 5 to 6 | Lab report filed against the lot number | Hold the lot, notify quality, review the regrind records for the affected blend | FM-04 Clip embrittled, barb cracks in service |
Every control exists because of a rated cause on the process FMEA. The two documents are edited on different schedules, which is how they stop agreeing.
History
Every field-level change to either document, newest first, including anything changed in this session.
- 18 Jun 2026CP-01sample frequency1 per shift1 per week
Pull tester moved to the lab cell, shift sampling no longer staffed
Quality - 12 May 2026CP-03evaluation methodIn-station vision system, suspect part locked outManual gauge check at the press
Vision cell removed during the line move, gauge check added as an interim control
Process Engineering - 12 May 2026Process Engineering
- 02 Apr 2026CP-05specification25 percent maximum20 percent maximum
Tightened after the Q1 brittleness containment
Materials