Control Plan · Injection Molding · Rev C

Part number
KMS-4417-02
Material
PA66-GF15
Process step
Injection Molding
Revision
C
Revised
2026-07-24
Team
Process Engineering, Quality, Tooling

Controls

Change the method or the frequency on any of the 4 detection controls. Each one states the Detection ratings it can back, and the FMEA row linked to it is checked against that as you go.

6 controls across 4 rated causes
CharacteristicSpecificationEvaluation MethodSampleControl MethodReaction PlanGuards Against
CP-01 · product
Snap-fit retention force
Injection Molding
Revised 18 Jun 2026
45 N minimum pull-out
Calibrated pull-force tester, lab cell
3 parts
Supports D 9
Logged in the lab record, trend reviewed monthlyQuarantine back to the last passing test, notify process engineering, 100 percent pull test until capability is re-establishedFM-01
Insufficient retention force
FMEA out of date
FM-01 carries D 7, this control supports D 9.
Reconcile on the worksheet
CP-02 · process
Pack pressure
Injection Molding
620 bar +/- 25
Press controller readout
Prevention control
Every cycle
Continuous
Automatic alarm on out-of-band, press holds the cycleStop the press, isolate parts back to the last good reading, correct the setpoint before restartFM-01
Insufficient retention force
CP-03 · product
Retention barb width
Injection Molding
Revised 12 May 2026
3.20 mm +/- 0.10
Manual gauge check at the press
1 part
Supports D 7 to 8
Recorded on the setup sheetSort back to the last good check, call tooling, verify cavity dimensions at the next serviceFM-02
Retention barb oversized, clip will not seat in panel hole
FMEA out of date
FM-02 carries D 4, this control supports D 7.
LowMedium
Reconcile on the worksheet
CP-04 · product
Parting line flash on the visible face
Injection Molding
No flash above 0.15 mm
End-of-line vision check
100 percent
Supports D 3 to 4
Automatic reject to chuteSegregate rejects, clean the tool at the next shift change, escalate to tooling above a 2 percent reject rateFM-03
Flash at the parting line on the visible face
CP-05 · process
Regrind ratio in the blend
Material preparation
Revised 02 Apr 2026
20 percent maximum
Blend recipe verified at the dryer
Prevention control
1 per lot
Every material lot
Blend sheet signed by the material handlerHold the lot, re-blend to specification, impact test before releaseFM-04
Clip embrittled, barb cracks in service
CP-06 · product
Notched Izod impact strength
Injection Molding
5.5 kJ/m2 minimum
Notched Izod impact test, off-line lab
1 part
Supports D 5 to 6
Lab report filed against the lot numberHold the lot, notify quality, review the regrind records for the affected blendFM-04
Clip embrittled, barb cracks in service

Every control exists because of a rated cause on the process FMEA. The two documents are edited on different schedules, which is how they stop agreeing.

History

Every field-level change to either document, newest first, including anything changed in this session.

4 recorded changes
  1. 18 Jun 2026
    CP-01sample frequency
    1 per shift1 per week

    Pull tester moved to the lab cell, shift sampling no longer staffed

    Quality
  2. 12 May 2026
    CP-03evaluation method
    In-station vision system, suspect part locked outManual gauge check at the press

    Vision cell removed during the line move, gauge check added as an interim control

    Process Engineering
  3. 12 May 2026
    CP-03sample frequency
    Every cycle1 per hour

    Manual check cannot run at cycle rate

    Process Engineering
  4. 02 Apr 2026
    CP-05specification
    25 percent maximum20 percent maximum

    Tightened after the Q1 brittleness containment

    Materials

Controls flagged out of date are the ones whose linked FMEA row still carries a Detection rating the control cannot support. Editing changes this session only, and a reload restores the seeded documents.